top of page

DETAIL DESIGN PACKAGE

EASTCOTE TOWN CENTRE,

HILLINGDON

Leading this public realm and SuDS scheme, our engineer delivered on complex repaving, rain garden, treescape and drainage network designs.

Practical, yet aesthetic paving, SuDS tree pits, de-cluttering strategy and innovative street furniture specifications combine to re-energise the 'look' and 'feel' of the town centre while reducing major flood issues underneath the surface.
 

Outside of the civil works detail design package, our critical input during tender stage optimised the scope of works. With our client's interest being a priority, we saved the London Borough of Hillingdon over £200,000 through statutory utility stakeholder negotiations.

GET IN TOUCH:

Ellizen Engineering

Kemp House

150-162 City Road
London
UK
EC1V 2NX

CONTACT US:

Thanks for submitting!

© Copyright 2022 by Ellizen Engineering LTD.

bottom of page